Allied & ICAR Exam Bank • ALLIED_0484 NAT • 2 Marks

Section 5: Irrigation and Drainage Engineering

Soil-Water-Plant Relationship

Subtopic: Soil-Water-Plant Relationship

Question Statement:

A field has Available Water Capacity $AWC = 120\text{ mm}$. The Management Allowed Depletion is $MAD = 55\%$. The Readily Available Moisture $RAM = MAD \times AWC$ in mm is:

Answer Key:

66

Step-by-Step Solution & Explanation

$RAM = 0.55 \times 120 = 66.0\text{ mm}$.
← Previous (ALLIED_0483) Next (ALLIED_0485) →

Practice In Authentic CBT Exam Interface

Test your skills under authentic timed conditions with live scoring and AIR percentile ranking.

Launch CBT Mock Test