Allied & ICAR Exam Bank • ALLIED_0929 MCQ • 1 Mark

Section 5: Irrigation and Drainage Engineering

Drainage Engineering and Salt Management

Subtopic: Salt-Affected Soils and Land Reclamation

Question Statement:

According to the USDA Salinity Laboratory, the leaching requirement ($LR$) for steady-state root zone salinity management with irrigation water salinity $EC_{iw}$ and maximum permissible drainage water salinity $EC_{dw}$ is expressed as:

Options:

  • (A) $LR = \frac{EC_{iw}}{EC_{dw}}$
  • (B) $LR = \frac{EC_{dw}}{EC_{iw}}$
  • (C) $LR = EC_{iw} - EC_{dw}$
  • (D) $LR = EC_{iw} \times EC_{dw}$

Answer Key:

A

Step-by-Step Solution & Explanation

By steady-state salt mass balance (salt applied = salt leached: $D_{iw} EC_{iw} = D_{dw} EC_{dw}$), leaching fraction $LR = D_{dw} / D_{iw} = EC_{iw} / EC_{dw}$.
← Previous (ALLIED_0928) Next (ALLIED_0930) →

Practice In Authentic CBT Exam Interface

Test your skills under authentic timed conditions with live scoring and AIR percentile ranking.

Launch CBT Mock Test