In first- and second-order gully tributaries, loose stone check dams are constructed to:

Options:

  • (A) Reduce gully channel bed slope, decrease runoff velocity, and trap eroded bed-load sediment
  • (B) Store water for long-term domestic consumption
  • (C) Prevent all runoff from exiting the watershed
  • (D) Accelerate water velocity to flush stones out

Answer Key:

A

Step-by-Step Solution & Explanation

Semi-permeable loose rock check dams create stepped flatter gradients behind each weir, settling sediment to gradually stabilize the gully bed and promote revegetation.