Question Bank • QB_EXP_SWCE_BND_007 NAT • 2 Marks

Section 4: Soil and Water Conservation Engineering

Terraces, Bunds & Vegetative Waterways

Subtopic: Horizontal spacing of contour bunds

Question Statement:

Contour bunds are to be constructed on agricultural land having a uniform land slope of $S = 4\%$. If the vertical interval is given by $VI = \left(\frac{S}{2} + 0.6\right)\text{ m}$, the horizontal spacing (interval) between two consecutive contour bunds is ________ $\text{m}$ (round off to one decimal place).

Answer Key:

65.0

Step-by-Step Solution & Explanation

Vertical Interval: $VI = \frac{4}{2} + 0.6 = 2.60\text{ m}$ Horizontal Interval $HI$ is: $HI = \frac{VI}{S / 100} = \frac{2.60}{0.040} = 65.0\text{ m}$
← Previous (QB_EXP_SWCE_BND_005) Next (QB_EXP_SWCE_BND_009) →

Practice In Authentic CBT Exam Interface

Test your skills under authentic timed conditions with live scoring and AIR percentile ranking.

Launch CBT Mock Test