Question Bank • QB_FM_076 NAT • 2 Marks

Section 2: Farm Machinery

Farm Machinery

Subtopic: Calculation of performance parameters – field capacity, efficiency, performance index, application rate and losses

Question Statement:

A mower with a cutter bar of $1.5\text{ m}$ length is cutting forage at a forward speed of $6\text{ km/h}$. If the total time lost in turning and unclogging is $20\%$ of operating time, calculate the time required in $\text{hours}$ to harvest a rectangular field of $3.6\text{ ha}$.

Answer Key:

5

Step-by-Step Solution & Explanation

Theoretical Field Capacity: $TFC = \frac{W \times S}{10} = \frac{1.5 \times 6}{10} = 0.90\text{ ha/h}$ Time loss is $20\%$, meaning field efficiency $\eta = 80\% = 0.80$. Effective Field Capacity: $EFC = TFC \times 0.80 = 0.90 \times 0.80 = 0.72\text{ ha/h}$ Total time required to cut $3.6\text{ ha}$: $t = \frac{\text{Area}}{EFC} = \frac{3.6}{0.72} = 5.0\text{ hours}$
← Previous (QB_FM_065) Next (QB_FM_092) →

Practice In Authentic CBT Exam Interface

Test your skills under authentic timed conditions with live scoring and AIR percentile ranking.

Launch CBT Mock Test