Question Bank • QB_SWCE_006 MSQ • 2 Marks

Section 4: Soil and Water Conservation Engineering

Soil and Water Erosion

Subtopic: Gully control structures – drop, drop inlet and chute spillways

Question Statement:

Which of the following statements regarding permanent gully control structures is/are correct?

Options:

  • (A) Drop spillways are generally installed for hydraulic drop heights less than 3 metres.
  • (B) Chute spillways are well suited for high drop structures and steep gullies.
  • (C) Drop inlet spillways consist of a vertical conduit or riser connected to a horizontal barrel through an earthen embankment.
  • (D) Drop spillways require an auxiliary vegetative emergency spillway when designing for total peak design flood.

Answer Key:

A, B, C

Step-by-Step Solution & Explanation

• Straight drop spillways are economical and structurally stable for drops typically up to 3 m (A is correct). • Chute spillways convey flood flows down steep slopes up to 5–6 m or more (B is correct). • Drop inlet spillways convey water through a vertical riser pipe to a nearly horizontal barrel buried beneath an embankment (C is correct). • Drop spillways are usually designed as the principal spillway to safely convey the design peak discharge without necessarily needing an emergency vegetative spillway unless specified for extreme floods.
← Previous (QB_SWCE_ERS_004) Next (QB_SWCE_EXP_036) →