Question Bank • QB_SWCE_ADV_124 MCQ • 1 Mark

Section 4: Soil and Water Conservation Engineering

Hydrology

Subtopic: Flood routing, hydrological reservoir and channel routing

Question Statement:

In uncontrolled reservoir flood routing (level pool routing), the peak outflow discharge occurs exactly at:

Options:

  • (A) The point of intersection of the outflow hydrograph with the receding limb of the inflow hydrograph
  • (B) The exact time of the inflow hydrograph peak
  • (C) The start of rainfall excess on the reservoir water surface
  • (D) The end of baseflow recession in the tailwater channel

Answer Key:

A

Step-by-Step Solution & Explanation

From the continuity equation $\frac{dS}{dt} = I - O$, the peak storage (and hence peak outflow $O$, since $S = f(O)$ is a monotonic function) occurs when $\frac{dS}{dt} = 0$, which requires $I = O$. This equality occurs at the point where the outflow hydrograph intersects the recession limb of the inflow hydrograph. Option A is correct.
← Previous (QB_SWCE_EXP_078) Next (QB_SWCE_ADV_123) →

Practice In Authentic CBT Exam Interface

Test your skills under authentic timed conditions with live scoring and AIR percentile ranking.

Launch CBT Mock Test