Section 4: Soil and Water Conservation Engineering
Surveying and Levelling
Subtopic: Chain surveying, methods of traversing
Question Statement:
A farm boundary line measured with a nominal $20.0\text{ m}$ metric chain was recorded as $250.0\text{ m}$. Subsequent laboratory calibration revealed that the chain was $0.10\text{ m}$ too long ($L' = 20.10\text{ m}$). The true length of the surveyed boundary line in meters is ________ (round off to two decimal places).